Diligence on commercial property covers title and survey, physical and environmental condition, zoning and entitlement, and the leases where the property is tenanted. Several of those run on third-party timetables, which is why the contingency period should be derived from the work rather than from convention.
Key takeaways
The contingency period should be built from the longest item, not a round number.
Environmental work is the item most likely to overrun, because a Phase I can trigger a Phase II.
Tenant estoppels depend on tenants who have no reason to hurry.
Title exceptions are tested against the buyer’s intended use, not in the abstract.
The acquisition structure carries a property tax consequence that belongs in the same analysis.
Diligence on a building runs on other people’s clocks. A surveyor’s availability, an environmental consultant’s schedule, a tenant’s willingness to sign an estoppel, a lender’s own review, a planning department’s hearing calendar — none of those compress because a purchase agreement says the contingency period is thirty days.
That is the structural problem with most property diligence timetables. They are set by habit or by what the seller will accept, and then the work is squeezed into them. The buyer arrives at the deadline choosing between waiving a contingency it has not satisfied and losing its deposit.
For a buyer acquiring commercial property in Pleasant Hill or elsewhere in Contra Costa County, this page sets out the four strands of the work, how long each realistically takes, and how the findings should feed back into the deal.
Contingency period
The period after signing during which a buyer may investigate the property and withdraw, usually recovering its deposit, if the investigations are not satisfactory.
Scope the four strandsTitle and survey, condition and environmental, zoning and entitlement, and leases where tenanted.
Identify the third-party clocksSurveyor, environmental consultant, tenants, lender and planning department.
Set the period from the longestWith an express extension right on defined terms rather than a negotiation at the deadline.
Run title earlyIt is cheap, fast and can be decisive, so it should not wait behind the slower work.
Convert findings into termsPrice adjustment, a condition, an escrow, or a decision not to proceed.
Sequencing diligence on a commercial property acquisition.
From risk to resolution
Problem
A thirty-day period for ninety days of work
The contingency period is agreed before the work is scoped. The environmental report arrives in week four recommending further investigation, the estoppels are outstanding, and the deposit goes hard with half the questions unanswered.
Solution
Build the timetable from the work
Each strand is scoped and its realistic duration established before the contract is signed, with the longest setting the period and an extension available on defined terms rather than by negotiation under pressure.
Resolution
Decisions made with the answers in hand
The buyer reaches the end of the period knowing the condition of the property, the state of title, what the approvals require and what the tenants will confirm. Waiving is then a decision rather than a gamble.
Title and survey
Title review should start immediately because it is inexpensive, quick and capable of ending a transaction. The preliminary report lists what the insurer will not cover, and the exceptions are the substance.
The report identifies instruments by recording reference rather than reproducing them, so ordering and reading the underlying documents is a separate step and the one most often skipped. A recording number tells a buyer that something exists; only the document says what it does.
Easements, covenants, recorded agreements and liens all run with the land and bind a successor owner regardless of whether that owner negotiated them. The review therefore tests each against the buyer’s intended use rather than in the abstract. An access easement across the rear of a site is immaterial to a buyer continuing the existing use and decisive for one planning to build there.
A survey connects the record to the ground. It earns its cost where easement locations cannot be determined from the record, where improvements may encroach on a neighbouring parcel or an easement area, or where the buyer intends to build and needs to know the usable envelope after setbacks and restrictions. It also supports deleting the general survey exception from the policy, which is usually worth having on a commercial acquisition.
Requirements listed by the insurer — reconveyances of paid-off deeds of trust, evidence of signing authority — are usually mechanical and occasionally slow, so they belong on the early list too.
Condition and environmental
Physical condition is assessed by a property condition assessment covering the structure, roof, mechanical, electrical and plumbing systems, and the paving and site works, with an estimate of near-term capital requirements. For a buyer that figure feeds directly into the price, because deferred maintenance is a cost the buyer inherits.
Environmental investigation is the item most likely to break a timetable. A Phase I environmental site assessment is a records and observation exercise: historical use of the site and surrounding properties, regulatory database searches, a site visit and interviews. It identifies recognised environmental conditions without taking samples.
Its legal significance is the protection it preserves. The all appropriate inquiries standard sits in 40 CFR Part 312, and by a final rule effective 13 February 2023 the EPA amended section 312.11 to recognise ASTM E1527-21 as satisfying that standard, phasing out the earlier E1527-13. Completing the inquiry is a precondition for the CERCLA bona fide prospective purchaser, contiguous property owner and innocent landowner protections, and those protections are unavailable to a purchaser who did not carry it out. The rule does not require anyone to use the standard; it defines what must have been done to claim the protections.
Two timing points follow. The inquiry must be completed before acquisition, because an assessment commissioned afterwards does not retrospectively create the defence. And where a Phase I recommends further investigation, a Phase II involving sampling and analysis takes considerably longer and costs substantially more than the contingency period usually allows.
A site with an industrial, automotive, dry cleaning, fuel storage or agricultural chemical history should be assumed to carry that risk, and the period set accordingly.
Obligations that continue after closing
The landowner protections are conditional on continuing obligations: taking reasonable steps with respect to any known release, complying with land use restrictions and not impeding institutional controls, cooperating with and providing access for response actions, and complying with information requests.
A buyer that obtains the protection correctly and then ignores a known condition for several years has a weaker position than its file suggests.
Zoning, entitlement and the leases
Zoning confirmation is straightforward for a buyer continuing the existing use and becomes a project in its own right for one intending something different. The questions are whether the intended use is permitted as of right or requires a discretionary approval, whether the existing use is conforming or legal non-conforming, and what any change would trigger.
Where the answer involves a discretionary approval, the agency’s hearing calendar governs rather than the deal, and the diligence period has to accommodate it or the agreement has to be conditioned on the approval.
Where the property is tenanted, the leases are the asset. The rent roll is a summary prepared by the seller; the leases themselves, with every amendment and side letter, are the actual position. The review covers term and renewal options, rent and escalations, what the tenant pays toward operating expenses, assignment and change of control provisions, and any outstanding landlord obligations such as an unpaid improvement allowance.
Estoppel certificates from each material tenant confirm that position directly from the party who would otherwise dispute it, and they should be requested at the start of the period because tenants have no reason to respond quickly. Delivery should be a closing condition rather than a reasonable efforts covenant.
Where the buyer will enter into or assume leases, Civil Code section 1938 requires every commercial lease executed on or after 1 January 2017 to state whether the premises have been inspected by a Certified Access Specialist, with any report due at least 48 hours before execution, a 72-hour rescission right where it is late, and the certificate and any outstanding report due within seven days after execution. Repairs for violations identified in a report are presumed to be the lessor’s responsibility unless the parties agree otherwise.
Structure, and converting findings into terms
Structure belongs inside diligence rather than after it, because it carries a consequence that can exceed every other cost in the transaction.
Where property is held in an entity, Revenue and Taxation Code section 64 decides whether an entity-level transaction constitutes a change in ownership. Subdivision (a) provides that transferring ownership interests is not deemed a transfer of the entity’s real property. Subdivision (c) triggers a change in ownership where a person obtains control — more than 50 percent of the voting stock of a corporation, or a majority ownership interest in a partnership or limited liability company — including where a transfer of 50 percent or less is the step by which control is obtained. Subdivision (d) adds the cumulative rule for original coowners transferring more than 50 percent of the interests across one or more transactions.
On a long-held asset, the difference between a reassessment and no reassessment can dwarf the diligence budget, the deferred maintenance estimate and the legal fees combined.
Everything the review finds then resolves into one of four outcomes: a price adjustment where the finding affects value directly; a closing condition where the problem can be fixed before completion; an escrow or specific indemnity where it is contingent; or a decision not to proceed.
The fifth outcome, discovering it after closing, is the one the exercise exists to prevent, and it is the only one where the buyer has no leverage at all.
Clark Meyers PC advises buyers and sellers of Contra Costa County commercial property from the firm’s Concord office at 1401 Willow Pass Road. The firm has no Pleasant Hill office; Pleasant Hill clients are served from Concord. Conor Meyers is licensed in California, Attorney License #157601.
Under contract on a Pleasant Hill property? The contingency period should reflect the work, not the calendar.
Four strands: title and survey, physical condition and environmental investigation, zoning and entitlement, and the leases where the property is tenanted, together with the structure of the acquisition itself.
How long should a contingency period be?
Derived from the longest item rather than from a round number. Environmental work, tenant estoppels and any discretionary approval all run on third-party timetables that do not compress to suit a contract.
Why start with title?
Title review is inexpensive, fast and capable of ending a transaction, so it should not sit behind slower work. Reading the underlying instruments rather than the list of recording references is the step most often skipped.
When is a survey worth commissioning?
Where easement locations cannot be determined from the record, where improvements may encroach, or where the buyer intends to build and needs the usable envelope. It also supports deleting the general survey exception.
What does a Phase I assessment achieve?
Completing the all appropriate inquiries standard is a precondition for the CERCLA bona fide prospective purchaser, contiguous property owner and innocent landowner protections, which are unavailable without it.
Which standard satisfies all appropriate inquiries?
An EPA final rule effective 13 February 2023 amended 40 CFR section 312.11 to recognise ASTM E1527-21 as satisfying the standard, phasing out recognition of the earlier E1527-13 standard.
Can the environmental work be done after closing?
The protections depend on the inquiry having been completed before acquisition, so an assessment commissioned afterwards does not create the defence however thorough it is. The timing is part of the requirement.
Why do tenant estoppels take so long?
They depend on tenants who have no particular reason to respond quickly, which is why they should be requested at the start of the diligence period and their delivery made a closing condition rather than a best efforts obligation.
Does the acquisition structure affect property tax?
Where property is held in an entity, Revenue and Taxation Code section 64 determines whether an entity-level transaction triggers reassessment through its control and cumulative transfer rules. On a long-held asset the consequence can be very large.